THU 27/07/17

THU 27/07/17

For 9 minutes:
1 – 15m walk lunge + rotation
2 – 20 sec HS Hold
3 – 5 High box jump from squat

Front squat + Press series

Clean Drills

Three position squat clean
Hip+knee+floor
Build to technical max

Jerk Drills

Split Jerk
Build to technical max

This entry was posted in Uncategorized and tagged .

Bookmark the permalink.

Follow any comments here with the RSS feed for this post.

Post a comment or leave a trackback: Trackback URL.